How a roofline replacement runs
- Survey. We check the fascia boards, soffits, bargeboards and gutters on every side you want included.
- Written quote. You get the lengths, the boards and the guttering listed, so you know exactly which sides are covered.
- Remove old boards. Old gutters and boards come off. The rafter ends behind are checked and repaired where they have rotted.
- Fit new uPVC. New fascias and soffits are fixed in place, with ventilation kept open where the roof needs it.
- New gutters and downpipes. Gutters are fitted to a fall towards the outlets and connected to the downpipes.
- Finish. The bottom row of tiles is checked, all waste is removed and the work is guaranteed in writing.
Signs your fascias and soffits need replacing
- Flaking paint and soft timber along the eaves
- Gutters sagging or pulling away from the boards
- Damp patches on the wall below the gutter
- Birds or wasps nesting in gaps at the eaves
- Soffit boards cracked, warped or missing
- Black streaks running down the wall under the roofline
Roofline options
- White uPVC fascias and soffits: The standard choice: low maintenance with no painting.
- Black or coloured gutters: Our gallery shows a new black gutter and downpipe against a white fascia.
- Vented soffits: Soffits with ventilation to keep air moving through the roof space.
- Roofline with a re-roof: Fitted while the scaffold is up for a new roof, as on our bungalow re-roof.
How long it takes
Roofline replacement on a semi-detached house or bungalow is a one to three day job, depending on how many sides are included and whether rafter ends need repair.
What affects the price
- Length of roofline and number of sides
- Height and access, including conservatories
- Rafter end repairs behind old boards
- Gutter style and number of downpipes
- Combining the work with a re-roof
Ask for the roofline as a separate line on your written quote so you can compare it on its own.
Aftercare
Wash the uPVC once a year with warm soapy water and clear the gutters each autumn. Check downpipe joints after the first heavy rain.