How we work on tiled roofs
- Survey. We check the tiles, the ridge, the hips, the verges and the felt or membrane visible from the loft.
- Written quote. The quote describes the tiles, ridge and verge work and any felt or batten repairs needed.
- Tile repairs. Broken or slipped tiles are replaced with matching tiles and fixed back to the battens.
- Ridges, hips and verges. Loose ridges and hips are re-bedded or converted to a dry fix system, and verges are finished with dry verge units or fresh mortar.
- Tiled re-roofs. For a replacement, the old tiles come off, new membrane and battens go on and the new tiles are fixed to suit the roof pitch.
- Sign-off. The roof is cleared, the gutters checked and the guarantee issued in writing on completion.
Signs your tiled roof needs attention
- Cracked or slipped tiles visible from the garden
- Ridge tiles rocking or missing mortar
- Verge mortar falling onto the path
- Concrete tiles that have lost their surface and turned porous
- Moss lifting the bottom edge of tiles
- Torn felt showing at the eaves
Tiles we fit and repair
- Grey concrete tiles: Used on our bungalow re-roof and on many modern hipped roofs.
- Red interlocking tiles: A common finish on 1960s and 1970s homes, and on one of the finished roofs in our gallery.
- Plain clay tiles: Small double-lap tiles on older houses, repaired or replaced to match.
- Dry ridge and dry verge: Mechanically fixed systems with no mortar to crack, used on our recent re-roofs.
How long it takes
Tile and ridge repairs are short jobs. A re-tile of a bungalow or small house takes several days once the scaffold is up. Your quote sets out what is included so you can compare like with like.
What affects the price
- Number of tiles or the area to re-tile
- Tile type and whether it is still made
- Ridge, hip and verge work
- Felt and batten repairs found during the job
- Access and scaffold
Our new roof cost guide has the pitched re-roof range for planning.
Aftercare
Keep gutters clear and trim back trees that drop leaves and moss onto the tiles. Look at the ridge line after high winds. Report a slipped tile early: one tile is a quick fix, a wet batten underneath is a bigger job.